Completed Project
General Civil Works at PDR3
| Project Name | General Civil Works at PDR3 |
| Project Cost | Rs. 18,31,67,069 |
| Project Duration | 18 Months |
| Location Of Project | Dahej, Gujrat |
| Client | Toyo Engineering India Pvt. Ltd. |
General Civil Works at PDR3
The scope of the work consist of carrying out civil construction of Truck loading Shed, RCC Pile Sleepers, Trenches, ERC’s FRC’s IRC’s RCC Drain, RCC culverts, Concrete Roads, RCC Paving, Equipment Foundation for Column, Pile caps, Pile head treatment, Vertical vessels, Horizontal vessels, Package Equipment’s, Local Foundation.